ASRC Gulf States Constructors has performed extensively for the U.S. Department of Energy, National Strategic Petroleum Reserve. Following are projects for National Strategic Petroleum Reserve; other projects are listed towards the bottom of this page.

National Strategic Petroleum Reserve

  • Site Security Detection System Upgrade
  • Upgrade Site Security Detection Systems CCTV – GFE
  • Site Modifications for Degas Plant – Vessels (GFE)
  • Site Modifications for Degas Plant – Flanges (GFE)
  • Site Modifications for Degas Plant – Pipe (GFE)
  • Clean and Inspect BMT-2
  • Potable Water System Upgrade
  • Lower Brine Disposal Pipeline at the Beach
  • Rep/Repl Fence at Site Entr.Rd, Contr.Lydn Area, & RWIS
  • Repair Rd Crossing Vents & Signage on WH/BH CO P/L & WH ROW Clean-up (Ike)
  • Raw Water Pigging Water Disposal (GFE)
  • Site Mods to Support Degas Plant
  • Degas Piping Cavern 112
  • Replace 100 KVA UPS System for Computer Center and DCS Lab
  • Seaway Dock Direct Assessment and Repair
  • Permanent Rplcmt of Entry Portal Bldg due to Hurricane Damage-GFE (IKE)
  • ADAS GFE
  • RWIS 34.5 KV Switch Replacement / Relocation – GFE (IKE)
  • Relocation of Cavern Spools
  • Main Site Perimeter Security System Replacement (IKE)
  • Upgrade Meter Controls to Delta-V (GFE)
  • Ground Based Radar Test Bed for Perimeter Detection Sys
  • Remote Control of Pipeline Valve Repair – Elect
  • Brine Pond Dike Repair (IKE)
  • Small Craft Intrusion Barrier Rep.& Installation
  • Relocate Overhead Line and Power Pole at Sun Pig Trap
  • Upgrade Meter Controls to Delta-V (Install)
  • Permanent Rplcmt of Entry Portal Bldg due to Hurricane Damage-Install (IKE)
  • RWIS 34.5 KV Switch Replacement / Relocation – Install (IKE)
  • ADAS GFE
  • Lightning Arrestor Pole Replacement (GFE)
  • Site Security Upgrade (Install) – ADAS, CCTV, SEDCA
  • Surveying/Hydro-excavation for Site Mods for Degas
  • Remote Pipeline Valve Repair  – Civil
  • Overlay Roof on Bldg. 802
  • Replace RWIS Bar Rack
  • Foundations for Degas Plant
  • Upgrade Site Security Detection Systems CCTV – GFE
  • Sump Pump to Drain Cavern 110
  • Replace 42-inch Raw Water Header
  • Raw Water Header Pipe (GFE)
  • Raw Water Header Fittings (GFE)
  • Fire Protection System Upgrades (GFE)
  • Replace 20KVA UPS System (Install)
  • BC & WH Arc Flash and Coordination Improvements
  • Replacement of Obsolete Siemens Relays
  • Fire Protection System Upgrades
  • Replacement of Obsolete Siemens Relays – GFE
  • Convert BMT-3 to External Floating Roof
  • Replace Air Actuated Valves with Electric Actuated Valves
  • HVAC – Bldgs. 800 & 801
  • RWIS Perimeter Fence Emergency Replacement
  • Site Wide Card Access

Other Notable Projects

  • Alaska Air National Guard: Steel Erection, Eielson Air Force Base
  • Alaska Native Tribal Health Consortium: North Star Health Clinic Remodel
  • City of Valdez: Mary Kevin Gleason Medical Clinic
  • Municipality of Anchorage: Anchorage Police Department Bullet Trap Replacement